Earned value analysis software, built on your own project data
Earned value analysis software compares what a project planned, what it has earned and what it has spent, period by period. Excel falls short because the schedule, the hours and the costs live in other systems, so someone joins them by hand every week and every project ends up with a different workbook.
Where spreadsheets break
The same figure, computed by hand in different places
In most project organisations the earned value workbook is fed from exports: the schedule from Primavera P6, the hours from the time-tracking system, the costs from the ERP. The calculation is sound; the plumbing is manual.
The result is a different spreadsheet per project, formulas that drift, and nobody able to trace a number back to its source without opening three files.
What I built
Site EVA at ANDRITZ Hydro Canada
Site EVA is a web application that produces weekly earned value for installation sites: hours planned in Primavera P6 against hours booked on site, with CPI by project and by unit. It replaced the Excel workbook that used to carry the calculation, and 24 projects are set up in it.
It reads from Primavera P6 and from the labour and time-tracking systems, and never writes to them. Every figure has its source system and query documented, and before anyone relied on a number the calculation was checked against the spreadsheet it replaced.
The full story, including the other applications built on the same foundation, is in the ANDRITZ Hydro Canada case study.
See it
An interactive demo with simulated data
The hydro project operations demo shows the idea on one screen: four units, planned against earned, and the weeks where the source data is inconsistent flagged instead of hidden. Every figure in it is invented.
FAQ
Questions project controls teams ask first
-
What is earned value analysis software?
Software that compares the work planned, the work actually done and the cost or hours spent on a project, and turns that into indicators such as CPI and SPI. Its job is to show, each period, whether a project is ahead or behind and over or under budget.
-
Why does Excel fall short for earned value?
Because the data lives elsewhere. Someone has to export the schedule, the hours and the costs and join them by hand every period, so each project ends up with its own workbook, its own formulas and no way to trace a figure back to its source.
-
Does it replace Primavera P6?
No. Primavera P6 stays the system of record for the schedule. The application reads from it and never writes to it.
-
How often is the data refreshed?
At ANDRITZ Hydro Canada the earned value is weekly, which is the cadence the site teams work to, and the planning reports run on a nightly copy of Primavera P6. The cadence is a design decision for each project.
Next step
Start with one project and one report
I work in short phases and on top of the systems you already run. The details are in how I work.